Resumen:
Since transmission rights are one of the key tools for furthering competition and market integration, transmission system operators should be required to auction all transmission rights backed by congestion rents. And the instrument of choice should be financial transmission rights.
Referencia DOI: https://doi.org/10.1016/j.tej.2013.12.001
Publicado en papel: Enero 2014.
Publicado on-line: Enero 2014.
Cita:
C. Batlle, P. Mastropietro, R. Gómez-Elvira, Toward a fuller integration of the EU electricity market: physical or financial transmission rights?. The Electricity Journal. Vol. 27, nº. 1, pp. 8 - 17, Enero 2014. [Online: Enero 2014]